Lumberton T-Hangar and 2-Unit Box Hangar

Bids are due on March 04, 2025 at 11 AM Eastern

The project shall consist of furnishing all labor, materials, and equipment and performing
all work required to satisfactorily complete the T-Hangar and 2-Unit Box Hangar project.
Items of work include erosion and sediment control; earthwork; pavement milling and
demolition; aggregate placement; drainage pipe and structure demolition and installation;
NCDOT concrete; concrete slab and foundation; water and sanitary sewer utilities;
asphaltic paving; pavement marking; sodding, seeding, and mulching; 2-unit box hangar
construction; and either 10-unit or 12-unit T-Hangar construction.

Downloadable Files

Plans

  • LBT-T-Hangar-and-2-Unit-Box-Hangar-PLANS-Project-3105-2401.zip Download

Specifications

  • LBT-T-Hangar-and-2-Unit-Box-Hangar-SPECS-Project-3105-2401-.zip Download
  • LBT-T-Hangar-and-2-Unit-Box-Hangar_Quantity-List.pdf Download

Addenda

  • LBT-T-Hangar-and-2-Unit-Box-Hangar_Addendum-No.-1_20250207-1.0-.pdf Download
  • LBT-T-Hangar-and-2-Unit-Box-Hangar_Addendum-No.-2_20250218.pdf Download

Download All


Do you have any questions?