Rosewood Middle School – Phase 1

Bids are due on September 05, 2024 at 3 PM Eastern

Daniels and Daniels Construction Company, as CM at Risk, is accepting subcontractor bids for the Rosewood Middle School Early Equipment Procurement and the Building Demolition and Building Pad Construction packages.  Sealed proposals will be received by Daniels and Daniels Construction Company at the location and times noted in the Bid Manual. Bid Opening will be held at the Wayne County Board of Education at 2001 E. Royall Ave. Goldsboro NC, 27534.

 

Questions deadline will be August 23rd. Submit any questions to Estimating@danddcc.com. Bid form is located under the RFP Section in each respective package (02a, 23a, and 26a)

 

 

ADDENDUM 1 LINK TO CAD FILE: https://www.dropbox.com/scl/fi/kydi3c5r52r9ledoej6ue/addendum-1-2024-08-20-Rosewood-MS-Early-Site-Demo.dwg?rlkey=un0c8kxwxdd2bbpb0vp1h2hk3&st=jptjubsd&dl=0

Downloadable Files

Plans

  • Rosewood-Middle-Prepurchase-Drawings-E09.01.pdf Download
  • Rosewood-Middle-Prepurchase-Drawings-E06.02.pdf Download
  • 2024.07.26-Rosewood-Middle-Addition-Mechanical-Prepurchase-Drawings-Highlighted.pdf Download
  • Drawings_Rosewood-MS-Early-Site-Demolition-Package_2024-08-09.pdf Download

Specifications

  • Project-Manual_Rosewood-MS-Early-Site-Demolition-Package_2024-08-09.pdf Download
  • 230511-HVAC-Electrical-Provisions.pdf Download
  • 230513-HVAC-Equipment-Motors.pdf Download
  • 230514-Variable-Speed-Controllers.pdf Download
  • 233400-HVAC-Fans.pdf Download
  • 236426-Air-Cooled-Chillers.pdf Download
  • 237200-Air-to-Air-Energy-Recovery-Equipment.pdf Download
  • 237316-Modular-Air-Handling-Units.pdf Download
  • 238216-Air-Coils.pdf Download
  • 260571-Power-System-Study.pdf Download
  • 262200-Dry-Type-Transformers.pdf Download
  • 262413-Switchboards.pdf Download
  • 262416-Panelboards.pdf Download
  • 263213-Packaged-Engine-Generator.pdf Download
  • 263600-Transfer-Switches.pdf Download

Addenda

Request for Proposal

  • 23A-Mechanical-Early-Procurement.docx Download
  • 26A-Electrical-Early-Procurement.docx Download
  • 02A-Existing-Conditions.docx Download
  • 01.-Invitation-to-Bid_Early-Package.docx Download

Download All